The yard consists of two parking and loading sidings, the first connected to the depot and to an opposite siding.
The yard houses a small scratch-built warehouse in Forex (closed-cell polistyrene) and plastic for which we publish a tutorial. (read more).
Access to the yard is routed from from the 1st track. As we have limited space available, two curved turnouts and two medium-radius turnouts have been positioned (scratch-built). Near the yard there will be a small water tower, also scratch-built with brass, copper, Forex and plastic. (Read the article).
The depot is located aside the station. This will probably host a diesel railcar, interlocking with a twin and circulating on layout the upper line. Next to the depot there is a siding. We published an article describing the constrution phases. (Read the article).