We assemble the structure of the 1st module, the one containing the left helical and housing the double connection line to the ghost station.
We have placed helical, sound absorbing cork and tracks. Giovanni checks the alignment and the slopes …
We also work on the parade line of the 2nd module, track bed and the reliefs profiles.
Then we set in place the parade line bridge .
Then we lay the tracks, the ballast and the portal, after which we go up with the helical towards the station left entrance.
We need a Friday afternoon and a whole Saturday to complete the hidden track bed on the 2nd module.
We place the ramp track bed from the base floor to the parade line and place pylons and sound absorbing cork.
Once the tests have been carried out, we lay the tracks using a ruler for alignment.
Realizziamo anche la sede per la stazione sotterranea che prevederà We also build the base for the ghost station housing 4 tracks..
And here are the two track plans in place. Coming soon the construction of the third module, the most complex.
The work on the 1st and 2nd modules are concluded for now. We move on to the other modules.